Dana Point Boaters Association

 

DRAFT
"SEIR"
Subsequent Environmental Impact Report
Dana Point Harbor Marina Improvement Project


November 20, 2011

Your Dana Point Boaters Association has acquired and released the following documents in response to the Draft Subsequent Environmental Impact Report (SEIR), Dana Point Harbor Marina Improvement Project. The following documents have been provided to OC Dana Point Harbor, County of Orange and Other Agencies.

Documents Are Live Below!
Revised Revitalization Plan With Recreational Boating Improvements - DPBA Draft Subsequent Environmental Impact Report (SEIR) Response (11-19-11.

Slip Pricing by SF (v7) (2011)
.

October 27, 2011

Notice of Availability—Extended Public Review Period To Adopt a Subsequent Environmental Impact Report for the Dana Point Harbor Marina Improvement Project. (September 20 - November 21, 2011)

September 20, 2011 ~ Draft SEIR 45-Day Public Review Period (September 20 - November 4, 2011).

Written comments responding to the adequacy and appropriateness of the Draft SEIR should be delivered/sent no later than 5:00PM on November 4, 2011 to: OC Dana Point Harbor, 24650 Dana Point Harbor Drive, Dana Point, CA 92629. The Draft SEIR and supporting technical reports are available for review by interested parties below in its entirety or at ocdph.com.

OC Dana Point Harbor Attention All Interested Parties ~ Notice of Availability/Notice of Intent To Adopt a Subsequent Environmental Impact Report for the Dana Point Marina Improvement Project (NEW)!

TABLE OF CONTENTS Download
1.0 EXECUTIVE SUMMARY Download
2.0 INTRODUCTION Download
3.0 PROJECT DESCRIPTION Download
4.0 EXISTING SETTING, IMPACTS, AND MITIGATION MEASURES
  1. LAND USE AND PLANNING
  2. GEOLOGY AND SOILS
  3. HYDROLOGY AND WATER QUALITY
  4. TRANSPORTATION AND CIRCULATION
  5. AIRQUALITY
  6. NOISE
  7. BIOLOGICAL RESOURCES
  8. AESTHETICS
  9. RECREATION
  10. HARZARDS AND HAZARDOUS MATERIALS
  11. GREENHOUSE GASES
Download
5.0 ALTERNATIVES Download
6.0 LONG-TERM IMPLICATIONS OF THE PROJECT Download
7.0 MITIGATION MONITORING AND REPORTING PORGRAM Download
8.0 CERTIFIED FINAL PROGRAM EIR NO. 591 MITIGATION Download
9.0 REPORT PREPARERS Download
10.0 REFERENCES Download

APPENDICES

APPENDICES COVER Download
A: NOTICE OF PREPARTION (NOP) & NOP COMMENTS Download
RE-ISSUED NOTICE OF PREPARTION Download
PROGRAM EIR EXECUTIVE SUMMARY Download
B: GEOLOGICAL ENGINEERING REPORT Download
C: DANA POINT HARBOR BOAT TRAFFIC STUDY Download
D: AIR QUALITY ANALYSIS Download
E: NOISE IMPACT ANALYSIS Download
F: MARINE BIOLOGICAL RESOURCES REPORT Download
FOCUSED SURVEY REPORT FOR EELGRASS AND INVASIVE ALGAE Download
MARINE BIOLOGICAL FIELD SURVEY RESULTS Download
NESTING BIRD REPORT Download